Sign In | Join Free | My enlightcorp.com
China Lanjing Steel Structure Co., Ltd. logo
Lanjing Steel Structure Co., Ltd.
Verified Supplier

1 Years

Home > Steel Structure Factory >

Prefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And Roof

Lanjing Steel Structure Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Prefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And Roof

Brand Name : Lanjing

Model Number : LJ-Workshop

Place of Origin : China

MOQ : 1000sqm

Price : 35-55$/sqm

Payment Terms : TT

Supply Ability : 40,000 Tons per year

Delivery Time : 30-45 days

Packaging Details : Single Item

Keyword : Light Frame Steel Construction

Main frame : Light Steel Q355 Q235

Window : Aluminum Alloy Window

Door : Sliding Door, Rolling Door

Wall & Roof : Sandwich panel; color steel sheet

Secondary Structure : Purlin; Brace; Knee Brace etc

Cladding : Steel color sheet

Column & Beam Connection : High Strength Bolt

Accessories : Skylight Belt; Ventilator; Downspout;Gutter etc

Drawing Design : Drawing Design

Color : Customer's Requirement

Roof Cladding : Corrugated Steel Sheet/Sandwich Panel

Certifications : ISO 9001, CE

Sail Finishing : PVDF/PTFE, Pvc Coated

Crane Capacity : 5Tons*2 Pcs

Structure Type : Light Steel Structre

Frame : Weld steel structure frame

material : steel

Price Term : FOB CIF CFR EXW

Design Software : Auto CAD,Teckla

Bracing : Round Bar/Angle Steel/Steel Rod

Lifespan : More than 50 years

Downpipe : UPVC

Life Time : 50 Years

Contact Now

Prefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And Roof


Product Description

The steel structure factory represents a pinnacle of industrial architecture, combining durability, efficiency, and sustainability. Widely utilized in manufacturing, logistics, and heavy industries, its construction process and functional advantages have revolutionized modern production landscapes‌.


‌1. Construction Process of a Steel Structure Factory‌
‌Design and Material Preparation‌
Engineers create customized blueprints based on operational needs, selecting high-grade steel beams, columns, and trusses. Prefabricated components ensure precision and reduce on-site assembly time‌.
‌Foundation Installation‌
A reinforced concrete foundation is laid to support the steel framework, ensuring stability against dynamic loads and environmental factors‌.
‌Primary Frame Assembly‌
Main columns and beams are erected using cranes, forming the skeleton of the factory. Bolted or welded connections guarantee structural integrity‌.
‌Secondary Components Integration‌
Purlins, bracings, and roofing systems are installed to enhance load-bearing capacity and weather resistance‌.
‌Cladding and Finishing‌
Insulated panels or corrugated metal sheets enclose the structure, providing thermal efficiency and aesthetic uniformity‌.


‌2. Functional Advantages‌
Rapid Construction‌: Pre-engineered components shorten project timelines by 30–50% compared to traditional methods‌.
Cost-Effectiveness‌: Reduced labor and material waste lower overall expenses, while recyclable steel aligns with circular economy principles‌.
‌Adaptability‌: Clear-span designs allow flexible interior layouts to accommodate machinery, storage, or production lines‌.
‌Durability‌: Steel resists corrosion, fire, and seismic forces, ensuring longevity with minimal maintenance‌.


‌3. Applications in Industry‌
Steel factories serve diverse sectors:

‌Manufacturing‌: High-ceiling spaces suit assembly lines for automotive or machinery production‌.
‌Warehousing‌: Robust frameworks support heavy shelving systems and automated logistics equipment‌.
‌Energy Projects‌: Solar panel installations or wind turbine component fabrication benefit from open, customizable layouts‌.


‌4. Safety and Sustainability‌
‌Safety Protocols‌: Workers wear helmets and follow strict guidelines during assembly to prevent accidents‌.
‌Eco-Friendly‌: Steel’s recyclability reduces carbon footprint, and energy-efficient cladding minimizes operational emissions‌.


Conclusion‌
The steel structure factory exemplifies innovation in industrial engineering, merging speed, resilience, and environmental stewardship. As technology advances, its role in global infrastructure will continue to expand, driving progress across industries‌.


Specification


Item Materials
Main steel frame column and beam Q235, Q355 steel, paint or galvanization
wind resistant column Q235, Q355 steel, paint or galvanization
Secondary bracing Roof purlin Q235B C/Z section galvanized steel
Wall purlin Q235B C/Z section galvanized steel
Tie bar Q235,φ89*3 round steel pipe
knee brace angle steel,Q235,L50*4
roof horizontal bracing φ20,Q235B steel bar, paint or galvanized
column vertical bracing φ20,Q235B steel bar, paint or galvanized
casing pipe φ32*2.0,Q235 steel pipe
Pulling bar Φ10 round bar Q235
Roof and wall Wall and roof panel corrugated steel sheet/sandwich panel
Protecting system gutter color steel sheet/galvanized steel/stainless steel
Trim and flashing color steel sheet
downspout PVC
self tapping screw
Fastener system Anchor bolts Q235 steel
High strength bolt The Specifications shall be determined according to the design of steel structure.
Normal bolt
Nuts
Window and door Window Aluminium windows
Door According to requirement to choose,can be EPS door,windproof door,high-speed roll-up door,industrial sliding door etc.

Prefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And Roof

Prefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And RoofPrefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And Roof


Product Tags:

Light Steel Structure Workshop

      

Industrial Steel Structure Workshop

      

Prefabricated Metal Buildings Workshop

      
Quality Prefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And Roof for sale

Prefabricated H Beam Steel Structure Factory With Sandwich Panel Wall And Roof Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Lanjing Steel Structure Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)